All-American Solar Services
A roofer in a rain jacket and safety harness carries a single solar panel up a metal roof past rows of empty mounting rails.

Riverside, California

Solar installer in Riverside, CA | All-American Solar Services

All-American Solar Services is a solar upgrade and installation service for Riverside homes on Riverside Public Utilities (RPU). It would check your billing agreement first, then price inverter, panel and battery work on separate lines, each with the tariff it leaves you on, so a repair doesn't end your NEM agreement by accident.

  • For Riverside homes with older solar systems
  • Inverter, panel and battery lines priced separately
  • Know your RPU tariff before you sign

Get your free quote Run the upgrade check

Private website concept. All-American Solar Services is shown here as a proposed upgrade service, not an operating company.

  • Riverside, CA
  • (800) 291-8522

Riverside, California

New arrays, and the old systems nobody will service

All-American Solar Services works on solar in Riverside and the Inland Empire: new arrays, and the systems installed a decade ago that the original company will not come back for. We read your utility agreement first, then price inverter, panel and battery work apart.

What customers say

All-American Solar ServicesSolar design and installation · Riverside, CA

Serving Riverside and nearby towns

What we do

What we do

  1. System takeoverAn existing array adopted, tested and brought back under monitoring.
  2. Inverter replacementA failed inverter swapped and the production figures re-baselined.
  3. Panel and battery additionsExtra capacity or storage added without rebuilding the array.
  4. Roof and ground mountsNew arrays on shingle, tile and ground mounts across the Inland Empire.

Call or visit

Talk to us

Phone(800) 291-8522Call to book an assessment.
Office4193 Flat Rock Rd, Riverside, CA 92505Parking on site.
EstimatesFree, in writingDesign and price as separate documents.

Get your free quote

Why homeowners pick us

Why homeowners pick us

  • We work on old systemsMost installers only want the new sale. We take the retrofit.
  • Agreement read firstWhat your interconnection allows is checked before anything is quoted.
  • Free written estimateA design and a price before you commit to anything.

Our story

Our story

  1. Servicing and installing across Riverside, Corona and the Inland Empire.

Upgrade check: does this change keep your agreement?

Pick the utility named on your bill, your original system size and the change you want. The check shows the growth limit that utility publishes for older net energy metering (NEM) agreements and what to ask it in writing.

A screening aid only. Each utility decides how its own rule applies to your system. Everything runs on this device; nothing is sent or stored.

The change

24% of the original

Inside RPU's 25% limit

Schedule NEM continues if RPU measures the 25% on DC nameplate.

Ask RPU in writing: is the 25% measured on DC nameplate or AC rating, and do earlier additions count?

On this page 11 sections

Check your RPU agreement before any quote

Before you approve an inverter swap, more panels or a battery, find out which billing agreement your system is on and what would end it. On an older Riverside system, that agreement often decides which option makes sense, so check it before anyone prices hardware.

RPU counts more than 4,700 Riverside homes and businesses with solar. If your system's permit was completed by October 31, 2022, it's likely on RPU's Schedule NEM (net energy metering). Under NEM, the power you send to the grid offsets the power you buy, netted over a 12-month period. If you export more than you use over that year, RPU pays the surplus at a set rate: $0.077 per kWh for 2026.

Schedule NEM closed to new customers on November 1, 2022. If you're already on it, you keep it until one of four things happens:

  1. You replace the system.
  2. You increase the original system's capacity by more than 25%.
  3. You install a new generating facility.
  4. You stop receiving service at the address, for example because you sell and move out.

Triggers two to four come from RPU's Schedule NEM itself. The first comes from RPU's web page, which says customers are not affected "unless they replace their system". Neither document defines "replace", so whether swapping only a failed inverter counts is the first question to put to RPU in writing, before anyone orders equipment.

You can also leave NEM by choice at any time; that switch is permanent.

The successor program is Self-Generation (Self-Gen). Homes go on the D-TOU time-of-use rate, and exports are credited at RPU's avoided cost of energy, which sits well below the price you pay for power you buy (the battery section shows both). If you sell a NEM home, the buyer doesn't inherit NEM: RPU's Self-Gen page says the new customer is placed on the Self-Generation rate automatically.

One correction: some directories list "Net Billing (NEM 3.0)" as Riverside's rule. According to the CPUC, that state tariff applies to new PG&E, SCE and SDG&E solar customers from April 15, 2023. RPU is city-owned and writes its own rules.

What each upgrade does to your agreement

Two terms first. kW DC is the panels' rated output added together, the "nameplate". The inverter's AC rating is what it delivers to your house as alternating current, usually less than the DC total. RPU's schedule doesn't say which one the 25% is measured against, and an upsized inverter can grow the AC figure without adding a single panel.

Upgrade Tariff after the change Confirm in writing with RPU
Same-size inverter (like-for-like: same AC rating) Stays on NEM, unless RPU treats it as "replacing the system" That an inverter-only swap is not a system replacement
Larger inverter (higher AC rating) NEM if the increase stays at or under 25%; Self-Gen above it Whether the 25% is measured on DC nameplate or AC rating
Panels adding up to 25% Stays on NEM The basis (DC or AC), and whether an earlier addition counts toward the same 25%
Panels adding more than 25% Self-Gen on D-TOU; exports credited at avoided cost Your Self-Gen sizing limit (up to 150% of historic yearly use)
Battery with RPU's storage rebate Self-Gen on D-TOU, required by the rebate Your rebate application date and fund availability

A battery without the rebate is the open case: the documents don't say whether it keeps you on NEM, so ask RPU.

This table is RPU's. Some unincorporated pockets near the city edge may be on Southern California Edison, so check the name on your bill. SCE's test differs: NEM customers can generally grow by the greater of 1 kW or 10%, and a sale doesn't end the NEM term (see the Norco page). For an SCE inverter swap, the like-for-like route is on the Jurupa Valley page.

what it covers and the site visit

How we work. The work would start at a desk, not on a ladder: an agreement check that names your tariff, the triggers that would end it, and the questions to send RPU. Then an on-site assessment of about 90 minutes (Illustrative duration).

Service choices

Pick the row that matches your situation. Each one starts with the same agreement check.

If you need We The tariff question it answers first
A failed or aging inverter replaced Quote a same-size inverter, and a larger one only if it helps Does RPU treat an inverter-only swap as replacing the system?
More production for an EV, heat pump or pool Price added panels on their own line, sized against the 25% threshold Does the addition stay at or under 25% of the original system?
A battery Price storage on its own line, with the rebate trade-off shown Is RPU's rebate worth the move to Self-Gen D-TOU?
A first solar system Quote a new system for RPU's Self-Gen program How large it may be (up to 150% of historic yearly use) and what exports earn

What would be checked

  1. Equipment inventory. Panels and inverter by make, model and DC and AC nameplate. Inverter age, error history, warranty and certification. Whether monitoring still reports.
  2. Ownership. Whether you own the system or it's leased or on a power-purchase agreement (PPA). A lease or PPA needs the provider's consent before anyone touches it.
  3. Production check. Monitoring data or meter readings against a fresh yearly estimate, to separate an inverter fault from shade, soiling or one failed panel.
  4. Roof life under the array. Adding panels to a roof that needs replacing soon means taking the whole array off later. The visit would note remaining roof life and spare roof faces.
  5. Main panel headroom. The main panel and busbar rating, which limits how much extra backfeed from solar or a battery it can take.
  6. Change scenarios. Each option modeled against the 25% threshold before it is priced.

What to have ready

  • The utility name from your bill
  • Twelve months of use from RPU's Home Energy EZ Profile Report (in your online account)
  • Your permission-to-operate (PTO) date, the day you were cleared to switch on
  • The original contract or interconnection agreement
  • Your latest true-up statement, the yearly NEM settlement
  • The monitoring login, and any lease or PPA documents

Coverage of Riverside and nearby towns is and has not been confirmed.

what you'd get in writing

How we work. Before you sign anything, you'd hold five documents:

  • Tariff status letter. Your agreement, its threshold, and the questions to put to RPU in writing.
  • Option sheet. Two or three priced options, each with scope, cost, kW change, tariff after the change, a one-year bill estimate under that tariff, and who files what.
  • Inverter replacement quote. Model, AC rating against the original, warranty and permit type.
  • Expansion or battery quote (optional). On its own line, never blended into the inverter price.
  • Responsibility sheet. Permit, RPU paperwork, inspection, meter work and PTO request, each with a named owner.

The bill estimate needs your real usage. Without 12 months of data, nobody can fill that column honestly. Here's an option sheet for one home.

Illustrative example. A Riverside home has a 5.0 kW DC system, permitted in 2019, on Schedule NEM. The string inverter has failed. The owners have bought an electric car and want more production.

Option Scope kW DC change Tariff after the change Confirm with RPU first
A Same-size inverter only 0 NEM Inverter-only swap is not a "system replacement"
B Same-size inverter plus three 400 W panels +1.2 kW (24%) NEM, if RPU measures on DC nameplate DC basis, and that A's answer still holds
C New inverter plus four 400 W panels +1.6 kW (32%) Self-Gen on D-TOU Self-Gen terms and the 150% sizing cap

Option B adds production under the threshold, if both written answers come back right. Option C adds the most and gives up NEM. Either can be the right call. The option sheet's job is to show which agreement you'd be on afterwards before you sign.

What drives the cost, and how to check an add-on price

Four things move an upgrade's price.

  • What failed. An inverter swap is mostly equipment and labor. Panels add racking, roof work, design and possibly a larger inverter.
  • Fixed costs. Permit, design, inspection and RPU paperwork are largely per-job costs, so they weigh more heavily on a small add-on than on a full system.
  • The roof and the main panel. A worn roof, or a main panel that can't take more backfeed, can cost more than the panels.
  • Incentives that no longer exist. The federal residential clean energy credit (25D) is not available for property placed in service after December 31, 2025, according to the IRS. An inverter, panels or battery placed in service in 2026 gets no 25D credit.

Property tax has its own date. California's new-construction exclusion for active solar systems is scheduled to sunset on January 1, 2027, according to the Board of Equalization. The Board's page doesn't say how additions to an existing system are treated, so ask the Riverside County Assessor before setting an install date. This isn't tax advice.

Checking the price of added panels

Only the added-panel line can fairly be measured in dollars per watt. Divide its price by the DC watts it adds.

Illustrative calculation · added-panel line on an RPU NEM home. Same 5.0 kW DC system: 25% is 1.25 kW of headroom. Three 400 W panels add 1.2 kW (24%), under it; four add 1.6 kW (32%), over it, if RPU measures DC nameplate. Suppose the expansion line quotes $5,400 for the 1.2 kW: $5,400 ÷ 1,200 W = $4.50 per added watt.

State benchmark: EcoGen's Solar Cost Index puts California at $2.85 per watt for a whole new system (September 2026 Edition, prices as of September 25, 2026, solar only).

That's well above the benchmark, which alone doesn't prove a bad deal. The index is a modeled installed price before incentives for a representative full system, not a quote. A 1.2 kW add-on spreads fixed permit, design and paperwork costs over far fewer watts.

Ask the installer to itemize those fixed costs, then divide what's left (panels and racking) by the added watts. If that's still far above $2.85, ask why.

Don't compare an inverter or battery line with $2.85 per watt. Neither adds solar watts, and the benchmark covers solar only.

Adding a battery: the rebate moves you to Self-Gen

RPU's Energy Storage Rebate pays $500 per kWh of storage, up to $10,000. Customers in RPU's SHARE program get $850 per kWh, up to $17,000. The battery must be customer-owned, purchased on or after July 1, 2026, and the application must go in within 180 days of purchase. Funding isn't reserved; check availability before you buy.

The rebate has a condition. Existing NEM customers who take it must transfer to Self-Gen on D-TOU.

Illustrative calculation · battery with the RPU rebate. A 13.5 kWh customer-owned battery bought after July 1, 2026: 13.5 × $500 = $6,750 rebate, under the $10,000 cap. Claiming it moves a NEM customer to Self-Gen D-TOU, where a summer on-peak export earns 9.95¢ per kWh (RPU's July 2026 to June 2027 rate), while summer on-peak power you buy costs 23.04¢ (Tier 1) to 36.86¢ (Tier 2) per kWh. Under NEM, exports net against imports over 12 months, and any yearly surplus earns 7.7¢.

On D-TOU, summer (June 1 to September 30) on-peak is 2 to 7 p.m.; winter on-peak is 4 to 9 p.m. Tier 1 and Tier 2 are the lower and higher price steps in RPU's D-TOU schedule.

So the trade is a one-time rebate against a different yearly bill, and the bill depends on when your house uses power and when your panels produce. Ask for the bill under each tariff, built from your 12 months of data, before you sign. If a quote shows the rebate but not the tariff change, it leaves out the part that affects every bill after it.

Permits at the City of Riverside

Most upgrades on an existing system take the City's standard permit route, not the fast lane. The City runs SolarAPP+, an automated online permit for simple rooftop solar, through its Public Portal. The SolarAPP+ fee is $25, plus the City's solar permit fee. But the City's page excludes projects with:

  • existing PV panels
  • existing or new battery storage
  • a main panel upgrade or derating
  • historic structures, or structures in a Historic Preservation District
  • 38 kW or more, ground mounts and ballasted racks

An inverter swap, expansion or battery on an older system hits at least one exclusion, which leaves the standard Building & Safety permit. Ask Building & Safety for that route's checklist and fee for your job, or have the installer show you the submittal before work starts. Newer tract systems in nearby SolarAPP+ cities raise different questions, covered on the Eastvale page.

The same page lists RPU's requirements: a lockable, visible-break, non-fused AC disconnect, and production no more than 150% of historical yearly use. Ask whether your existing disconnect qualifies.

Contractors need a City Business License and a state contractor's license, usually a C-46 (solar) or C-10 (electrical) for residential solar. Look the number up on the CSLB license check before you sign.

If your home is a designated historic resource or in a historic district, it falls outside SolarAPP+. Talk to City Planning before any design work, and ask whether the change needs a Certificate of Appropriateness.

From signed scope to switch-on

Don't switch an upgraded system back on until RPU's process says you can. RPU's All About Solar page sets out the sequence:

  1. Permit. The contractor usually applies for the City permit and files the RPU interconnection and any rebate paperwork.
  2. Installation to the approved plans.
  3. City final inspection. The system may not be turned on before it.
  4. RPU notified. The inspector tells RPU to release the meter and interconnect.
  5. Net meter installed by RPU's Meter Shop, at the same time as interconnection.
  6. Permission to operate (PTO) = City approval plus RPU's net meter.

The City does not issue an official PTO letter. For PTO in writing (for your records, a lender or a buyer), email RPU. Status also shows on the City's Solar Map.

For an upgrade, that written PTO is your record of the scope RPU accepted. Check that it matches what your tariff status letter said would happen.

Aftercare for an older system

An upgraded system has parts of two ages. Settle who stands behind each before you sign.

  • Original inverter warranty. If still active, who honors it, and must the original installer or manufacturer do the work?
  • Replacement inverter warranty. What it covers, and whether it starts at installation or purchase.
  • Workmanship. Does the original workmanship warranty survive a third party's work? Get the new installer's terms in writing.
  • Monitoring. Who restores it, who owns the login, and do you get the data?

Inverters deserve the extra questions. NREL's 2018 PV operations and maintenance best-practices guide notes that 10-year inverter warranties were then commonly available, and that inverter failure is one of the most frequent causes of PV performance loss. If your inverter came with a 10-year warranty and went in before 2016, that warranty has already run out.

Inverter type shapes the upgrade. On a string inverter, panels are wired in series to one central unit, and RPU notes a string performs only as well as its weakest panel; adding panels means checking the inverter can take them. Microinverters sit under each panel, so each added panel normally needs its own; ask whether the new ones work with the old.

After switch-on, RPU's advice: learn your production display, check it at least monthly, and ask about a maintenance contract.

Questions to ask before you sign

Use this with any solar installer in Riverside, alongside the quote checklist on this site.

Ask RPU in writing

  • Does replacing only the inverter count as "replacing the system" under Schedule NEM?
  • Is the 25% limit measured on DC nameplate or on AC rating?
  • Do additions made in two steps count toward the same 25%?
  • If I add a battery without the rebate, do I stay on NEM?

Ask the installer

  • What is the kW change in DC and AC, as a percentage of my original system?
  • Which tariff am I on after this work, and what's the one-year bill estimate under it?
  • Are the inverter, added panels and battery priced on separate lines?
  • What is the price per added watt for the panel line alone, and what fixed costs are in it?
  • Which permit route applies, and who files the permit and the RPU paperwork?
  • Who requests written PTO from RPU, and when?
  • For the storage rebate: are funds available, and who files within 180 days?
  • What is your CSLB license number and classification?

Red flags

  • "The 30% federal credit covers your new inverter." The 25D credit ended for property placed in service after 2025.
  • "Adding panels won't affect your NEM." Above 25%, it ends.
  • "The battery rebate is free money." For a NEM home it costs the NEM agreement.
  • "Riverside is on NEM 3.0." Riverside writes its own rules.

Short answers

Can I still get the 30% federal tax credit on an upgrade? No. The 25D credit isn't available for property placed in service after December 31, 2025, so 2026 inverters, panels and batteries don't qualify.

What does a new solar system cost in Riverside? As a state benchmark, EcoGen's Solar Cost Index (September 2026 Edition) puts California at $2.85 per watt, or $19,095 for a 6.70 kW system, before incentives, solar only, with any battery priced separately. Your own quote depends on system size, roof condition and main panel capacity, and no 25D credit applies in 2026.

Does NEM 3.0 apply to my Riverside home? Not if RPU is your utility. RPU runs Schedule NEM for legacy systems and Self-Gen for new ones.

If I sell my house, does the buyer keep NEM? No. Under RPU's rules, a new customer at a NEM address goes on Self-Gen automatically. SCE treats a sale differently.

I don't have solar yet. Would we help? Yes, as a secondary path. A new RPU system goes on Self-Gen D-TOU, sized up to 150% of historic yearly use, with exports credited at avoided cost. Separate lines, price per watt and written PTO still apply.

Is this the same business as other "All American Solar" names in search results? Several solar businesses use similar names. All-American Solar Services, as described here, is a upgrade service for Riverside homes. Whoever quotes you, check that the business name on the contract matches its CSLB license record.

I'm in Corona. Is it the same? No. Corona addresses are served by either SCE or the city's own utility, a third rulebook covered on the Corona page.

Four nearby towns, three rulebooks

The utility on the bill decides which upgrade rule applies. Miles are straight lines from the Riverside listing address, not road miles or a service limit. Coverage of these towns is proposed and unconfirmed.

Get your free quote

Choose your town and the upgrade you want priced. The site builds a checklist to bring to any installer's quote visit, so every line of the quote can be compared. It runs on this device: nothing is sent or stored.